sanitation@lemmy.radio to Technology@lemmy.worldEnglish · 2 months agoKevin O’Leary’s proposed 9GW "hyperscale" AI data center in Utah will consume double the state's entire electricity usage and generate the waste heat of 23 atom bombs a day.www.sltrib.comexternal-linkmessage-square179linkfedilinkarrow-up1864arrow-down112cross-posted to: technology@lemmy.ziptechnology@lemmit.online
arrow-up1852arrow-down1external-linkKevin O’Leary’s proposed 9GW "hyperscale" AI data center in Utah will consume double the state's entire electricity usage and generate the waste heat of 23 atom bombs a day.www.sltrib.comsanitation@lemmy.radio to Technology@lemmy.worldEnglish · 2 months agomessage-square179linkfedilinkcross-posted to: technology@lemmy.ziptechnology@lemmit.online
minus-squareCroquette@sh.itjust.workslinkfedilinkEnglisharrow-up19·2 months agoJust a quick correction, its M capital for Mega, m is for milli. And Giga is also G capital, not sure there is a low case g for engineer notation.
Just a quick correction, its M capital for Mega, m is for milli.
And Giga is also G capital, not sure there is a low case g for engineer notation.